Skip to content

Case Studies / Industrial missions

Industrialmissions,notobservation.

Each block summarises a representative mission profile. Named-customer references are available under NDA to qualified buyers.

Public references / Q3 2026

Named-customer references are released as contracts are signed.

We do not publish operator names without explicit written permission. The mission profiles below describe representative work — concrete numbers and customer references are exchanged in qualification calls under NDA.

  • Mission 01 / 03

    Power-line corridor inspection

    Transmission · 200+ km · TSO

    Single-flight inspection of 200+ km of high-voltage transmission. RGB + IR imagery, anomaly-flagged, geotagged, integrated into the asset management system. Replaces a three-day helicopter rotation.

    Endurance
    12 h
    Range
    200 km
    Payload
    12 kg
  • Mission 02 / 03

    Pipeline methane LDAR

    Compliance · OGMP 2.0 · EU Methane Reg.

    Methane LDAR sweep against the EU Methane Regulation 2024/1787 and OGMP 2.0. Sensor-calibrated readings with defensible documentation, ready for regulator and verifier inspection.

    Endurance
    12 h
    Range
    200 km
    Payload
    12 kg
  • Mission 03 / 03

    Forest fire post-incident assessment

    Environment · 48-hour turnaround

    Post-incident assessment over fire-affected forestry blocks. Long-endurance scanning delivers a complete damage map within 48 hours — versus the six-week ground-based survey it replaces.

    Endurance
    12 h
    Range
    200 km
    Payload
    12 kg

Have a corridor in mind?

Tell us about the route. We come back with a fly-plan.